Green wall in the Provisional Market of l’Abaceria In August of 2017, Xavier Grau, Adroch architect, proposed to work on a basic design of the green wall with us to be installed in the provisional location of the Mercat Provisional de l’Abaceria once installed in Passeig de Sant Joan. Unfortunately, it seems that the awarded company decided not to incorporate this action and has replaced the green wall with a graphic design. Project detailsDesign:-Execution:-Maintenance:-System used:-Year of realization:-Location:-Green area:- {"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"false","rtl":"false"} Contact us Reason of consultation: ProjectMaintenance I accept the privacy policies